You have commented 338 times on Rantburg.

Your Name
Your e-mail (optional)
Website (optional)
My Original Nic        Pic-a-Nic        Sorry. Comments have been closed on this article.
Bold Italic Underline Strike Bullet Blockquote Small Big Link Squish Foto Photo
Science
SpaceX beat out SLS to launch the moon orbiting station.
2021-02-11
NASA Awards Contract to Launch Initial Elements for Lunar Outpost

NASA has selected Space Exploration Technologies (SpaceX) of Hawthorne, California, to provide launch services for the agency’s Power and Propulsion Element (PPE) and Habitation and Logistics Outpost (HALO), the foundational elements of the Gateway. As the first long-term orbiting outpost around the Moon, the Gateway is critical to supporting sustainable astronauts missions under the agency’s Artemis program.

After integration on Earth, the PPE and HALO are targeted to launch together no earlier than May 2024 on a Falcon Heavy rocket from Launch Complex 39A at NASA’s Kennedy Space Center in Florida. The total cost to NASA is approximately $331.8 million, including the launch service and other mission-related costs.

The PPE is a 60-kilowatt class solar electric propulsion spacecraft that also will provide power, high-speed communications, attitude control, and the capability to move the Gateway to different lunar orbits, providing more access to the Moon’s surface than ever before.

The HALO is the pressurized living quarters where astronauts who visit the Gateway, often on their way to the Moon, will work. It will provide command and control and serve as the docking hub for the outpost. HALO will support science investigations, distribute power, provide communications for visiting vehicles and lunar surface expeditions, and supplement the life support systems aboard Orion, NASA’s spacecraft that will deliver Artemis astronauts to the Gateway.

About one-sixth the size of the International Space Station, the Gateway will function as a way station, located tens of thousands of miles at its farthest distance from the lunar surface, in a near-rectilinear halo orbit. It will serve as a rendezvous point for Artemis astronauts traveling to lunar orbit aboard Orion prior to transit to low-lunar orbit and the surface of the Moon. From this vantage, NASA and its international and commercial partners will conduct unprecedented deep space science and technology investigations.

NASA’s Launch Services Program at Kennedy will manage the SpaceX launch service. The HALO is being designed and built by Northrop Grumman Space Systems of Dulles, Virginia, and the PPE is being built by Maxar Technologies of Westminster, Colorado. NASA’s Johnson Space Center in Houston manages the Gateway program for the agency. NASA’s Glenn Research Center in Cleveland is responsible for management of the PPE.

Posted by:3dc

#3  SLS should have been killed WAY before this. What a boondoggle.
Posted by: Pakvi Roti   2021-02-11 08:57  

#2  Rumors float that Bidet* wants to kill SLS and manned NASA projects. Maybe Shelby's retiring because he doesn't want it said he didn't have the clout to stop that from happening...
Posted by: M. Murcek   2021-02-11 07:09  

#1   At the Outer Planets Assessment Group meeting, Bob Pappalardo said the Europa Clipper project received formal direction Jan. 25 to cease efforts to support compatibility with SLS; plan is to proceed with a commercial launch vehicle [like Falcon Heavy].
— Jeff Foust (@jeff_foust) February 10, 2021

https://twitter.com/jeff_foust/status/1359591780010889219
Posted by: 3dc   2021-02-11 01:06  

00:00